DOMESTAR Geodesic Dome Connectors 2V 3/4 FLAT BASE: Kit of 36 galvanized steel metal mounting connectors for 2 3/4 frequency dome

199,00 €

36 PROFESSIONAL CONNECTORS: 2.8mm thick galvanized steel for 2V frequency 3/4 cutting geodesic dome. This kit contains only the connectors.
VIDEOS, user manual and personal support: you will have access to all the assembly videos and a support phone line to guide you during the assembly.
FLEXIBLE SIZE: you choose the size of your dome. Ex: 1.25m joists = a 4.8m diameter and 2.4m high dome. 1.47m joists = 5.6m diameter and 2.80m high.
EASY ASSEMBLY: it takes about 4 to 6 hours for one person to assemble the 2V frequency geodesic dome with the DOMESTAR connectors.
FLAT BASE: Our model has a flat base which makes it easy to use once covered.

Availability: Only 2 left in stock

Quantity New Price
1-2 199,00 €
3+ 189,05 €
5+ 184,08 €
7+ 179,10 €
10+ 174,13 €
SKU: domestarF2-34 Category: Brand:

DOMESTAR: 36 galvanized steel connectors for 2V geodesic dome (frequency 2)
What’s included:
– 10 x 4-branch
connectors- 6 x 5-branch
connectors- 20 x 6-branch
connectors- assembly instructions and links to assembly video

This Domestar V2 3/4 kit has a 3/4 sphere cut-out: it is therefore one level higher than the Domestar V2 model.

FLAT BASE
Our connectors allow you to have a perfectly flat base which makes your dome much more practical.

TECHNICAL FEATURES:
Material: galvanized steel, 2.8mm thick. High rain resistance.
Connector diameter: 19.5cm

In addition to the connectors you will need:
95 wooden studs / joists / rafters. You will have access to my calculator to determine the length of the studs. There are only 3 different lengths.
The length of the studs will determine the diameter and height of the dome.
190 TRCC bolts (round head square neck) 1 or 2 cm longer than the height of the studs.

You will need the following tools:
– a saw (normal or jigsaw, circular or radial) to cut the joists to the correct size
– a drill for the holes in the joists
– a hammer to drive the bolts
– a wrench to screw in the nuts
– a ladder or stepladder

The purchase of this kit includes a detailed instruction manual, installation videos and tutorials and telephone or email access to our assembly assistance service. I do everything to make the assembly as easy as possible for you: once the equipment is gathered it takes about 4 to 6 hours to assemble the geodesic dome with the DOMESTAR connectors.

Weight 10900 g
Dimensions 23 × 23 × 18 cm
Scroll to Top