DOMESTAR: 36 STAINLESS STEEL connectors for 2V geodesic dome (frequency 2)
What’s included:
– 10 4-branch connectors
– 6 5-branch connectors
– 20 6-branch connectors
– assembly instructions and links to assembly videos
More height
This Domestar V2 3/4 kit features a 3/4-sphere cutout: so it is one level higher than the Domestar V2 model.
BASE PLATE
Our connectors ensure a perfectly flat base, making your dome much more practical.
TECHNICAL SPECIFICATIONS:
Material: stainless steel, 2.8 mm thick. Highly resistant to rain.
Connector Diameter: 19.5cm
In addition to the connectors you will need:
95 wooden studs / joists / rafters. You will have access to my calculator to determine the length of the studs. There are only 3 different lengths.
The length of the studs will determine the diameter and height of the dome.
190 TRCC bolts (round head square neck) 1 or 2 cm longer than the height of the studs.
You will need the following tools:
– a saw (normal or jigsaw, circular or radial) to cut the joists to the correct size
– a drill for the holes in the joists
– a hammer to drive the bolts
– a wrench to screw in the nuts
– a ladder or stepladder
The purchase of this kit includes a detailed instruction manual, installation videos and tutorials and telephone or email access to our assembly assistance service. I do everything to make the assembly as easy as possible for you: once the equipment is gathered it takes about 4 to 6 hours to assemble the geodesic dome with the DOMESTAR connectors.
