DOMESTAR Geodesic Dome Connectors 2V 3/4 FLAT BASE STAINLESS STEEL: Kit of 36 stainless steel metal mounting connectors for 2 3/4 frequency dome

259,00 €

36 PROFESSIONAL CONNECTORS: 2.8mm thick stainless steel for 2V frequency 3/4 cutting geodesic dome. This kit contains only the connectors.
VIDEOS, user manual and personal support: you will have access to all the assembly videos and a support phone line to guide you during the assembly.
FLEXIBLE SIZE: you choose the size of your dome. Ex: joists of 1.25m = a dome of 4.8m in diameter and 2.4m in height. Joists of 1.47m = 5.6m in diameter and 2.80m in height.
EASY ASSEMBLY: It takes one person approximately 4 to 6 hours to assemble the 2V geodesic dome using DOMESTAR connectors.
FLAT BASE: Our model has a flat base which makes it easy to use once covered.

Availability: In stock

Quantity New Price
1-2 259,00 €
3+ 246,05 €
5+ 239,58 €
7+ 233,10 €
10+ 226,63 €
SKU: domestarF2-34-ss Category: Brand:

DOMESTAR: 36 STAINLESS STEEL connectors for 2V geodesic dome (frequency 2)
What’s included:
– 10 4-branch connectors
– 6 5-branch connectors
– 20 6-branch connectors
– assembly instructions and links to assembly videos

More height
This Domestar V2 3/4 kit features a 3/4-sphere cutout: so it is one level higher than the Domestar V2 model.

BASE PLATE
Our connectors ensure a perfectly flat base, making your dome much more practical.

TECHNICAL SPECIFICATIONS:
Material: stainless steel, 2.8 mm thick. Highly resistant to rain.
Connector Diameter: 19.5cm

In addition to the connectors you will need:
95 wooden studs / joists / rafters. You will have access to my calculator to determine the length of the studs. There are only 3 different lengths.
The length of the studs will determine the diameter and height of the dome.
190 TRCC bolts (round head square neck) 1 or 2 cm longer than the height of the studs.

You will need the following tools:
– a saw (normal or jigsaw, circular or radial) to cut the joists to the correct size
– a drill for the holes in the joists
– a hammer to drive the bolts
– a wrench to screw in the nuts
– a ladder or stepladder

The purchase of this kit includes a detailed instruction manual, installation videos and tutorials and telephone or email access to our assembly assistance service. I do everything to make the assembly as easy as possible for you: once the equipment is gathered it takes about 4 to 6 hours to assemble the geodesic dome with the DOMESTAR connectors.

Weight 10900 g
Dimensions 23 × 23 × 18 cm
Scroll to Top